The Azerspace/Africasat-1 payload to be orbited on Ariane 5’s 2013 year-opening flight is to provide C- and Ku-band communications services to Azerbaijan, Central Asia, Europe and Africa from an orbital location at 46 deg. East Longitude. It was built by Orbital Sciences Corporation based on Orbital’s Star-2 platform. The satellite was contracted by the Republic of Azerbaijan’s Ministry of Communications and Information Technologies—which is the sole shareholder in the country’s national satellite operator, Azercosmos.
Under a contract with The Ministry of Communications and Information Technologies of the Republic of Azerbaijan (the Ministry), Orbital is designing and building the Azerspace/Africasat-1a commercial communications satellite.
Based on Orbital’s flight-proven GEOStar-2™ platform, the hybrid C- and Ku-band satellite will generate approximately five kilowatts of payload power and carry 36 active transponders. Azerspace/Africasat-1a will provide communications services to Azerbaijan, Central Asia, Europe, and Africa from an orbital location at 46 degrees East Longitude through an arrangement between the Ministry and Measat of Malaysia, which owns the rights to the orbital slot.



