WASHINGTON — NASA issued $1.3 billion in commercial launch task orders to SpaceX, Blue Origin, and Relativity Space, among other providers, to orbit infrastructure supporting its planned permanent lunar base, the agency announced on Saturday, Nov. 7, 2026.

The major procurement accompanies the formal selection of eight commercial vendors under the Commercial Lunar Payload Services 2.0 (CLPS 2.0) contract, alongside a decision to fabricate the new PROMISE lunar polar rover for delivery aboard a commercial lander in late 2028.
Lunar Base Logistics and Procurement Restructuring
The launch surge marks an operational transition from exploratory scout missions toward sustaining recurring logistics for surface habitation at the lunar south pole. The effort builds on earlier programmatic milestones, including NASA’s shift to CLPS 2.0 to standardize payload interfaces and lower transit costs, as well as previous Commercial Lunar Payload Services contracts for 2028 Artemis missions. Under the renewed CLPS 2.0 framework, NASA selected eight commercial contractors, integrating newcomers ispace U.S. and Northrop Grumman alongside flight-proven incumbent lander developers.
Flight Architectures, Tug Integration, and Lunar Hoppers
To deliver mission hardware into trans-lunar trajectories, the contracted launch vehicles will interface with high-energy orbital transfer vehicles provided by Quantum Space and Impulse Space’s orbital transfer architecture. The launched payloads include dedicated orbital relays for communications and technology demonstrations, as well as MoonFall, a robotic surface exploration flight suite consisting of three autonomous lunar hopper spacecraft engineered to conduct regional reconnaissance across rugged terrain.
PROMISE Rover Development and 2028 Delivery Schedule
In a complementary planetary science determination, NASA confirmed it will develop the Polar Resources and Observation Mission for In-situ Subsurface Exploration (PROMISE) rover. Sourced from spare engineering models of the Mars Curiosity and Perseverance rovers, the polar exploration vehicle will be constructed under a strict cost cap of $400 million.
The rover is scheduled for delivery to the lunar south pole in late 2028 aboard a Blue Moon Mark 1 cargo lander launched on Blue Origin’s New Glenn rocket.


